Interval Meters
Download the latest Interval Meter Information
By PUCO mandate, electric choice customers having a peak demand that is equal to or exceeds 200 kW within the last 12 months are required to install an interval meter. The customer must also install and maintain a dedicated analog telephone line or, as an alternative, order a wireless meter. Available for download below are the interval meter request form, metering requirements, and telephone line installation instructions.